SOCAR · Gunashli
Gunashli-10 — Slim-Hole OBM
OBM2024Offshore Azerbaijan
Slim-hole well drilled & completed with OBM; ~40 t/day.
At the Gunashli-10 DSB site, a slim-hole well was successfully drilled and completed using oil-based drilling fluids over a four-month period and handed over to the client, producing approximately 40 metric tons per day on preliminary data.