Skip to content
GLOLYNX · Bibiheybat

GLOLYNX — Bibiheybat Campaign

OBM2024Onshore Azerbaijan

13+ wells delivered with diesel-based fluids; campaign ongoing.

ODS provides mud engineering consultation for GLOLYNX’s drilling operations at Bibiheybat. Operations began in March 2024; more than 13 wells have been drilled and delivered using diesel-based drilling fluids, with further wells ongoing.