GLOLYNX · Bibiheybat
GLOLYNX — Bibiheybat Campaign
OBM2024Onshore Azerbaijan
13+ wells delivered with diesel-based fluids; campaign ongoing.
ODS provides mud engineering consultation for GLOLYNX’s drilling operations at Bibiheybat. Operations began in March 2024; more than 13 wells have been drilled and delivered using diesel-based drilling fluids, with further wells ongoing.