DH · Garadagh
Garadagh #609 — Stuck-Pipe Recovery
OBM2024Onshore Azerbaijan
Freed stuck pipe after a 7-day differential-sticking event; first dispersed-barite integration on an onshore rig in Azerbaijan.
At Garadagh Well No. 609, the ODS engineering team applied intensified operational measures to control drilling-fluid losses, carried out immediate analyses, and freed the stuck tool after a 7-day differential-sticking event. The team integrated dispersed barite into the active system for the first time on an onshore drilling rig in Azerbaijan, earning a Letter of Appreciation from the client.